PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Bolting Derrick -2 Facing North (800x600).jpg Bolting Derrick -2 Facing West (800x600).jpg Compacting 2 lift along foundation walls at column line 1 from G.1-E.3 Facing North-East(800x600).jpg Compacting aroung Monumental Stair radius Facing North-West (800x600).jpg Installing Metal deck angles at Elev. 4,5 (3rd Floor) Facing South East (800x600).jpg Metal Deck angles at Elev. 4,5 (3rd Floor) Facing East (800x600).jpg Metal Deck angles at Elev. 4-Stair -2 (3rd Floor) Facing South (800x600).jpg Metal Deck angles at Elev. 4-Stair -4 Facing South (800x600).jpg Bolted Column at Derrick -2 Facing South-East (800x600).jpg
Previous pageNext page Installing Metal deck angles at Elev. 4,5 (3rd Floor) Facing South East (800x600)
Installing Metal deck angles at Elev. 4,5 (3rd Floor) Facing South East (800x600)